Monday, November 1, 2010

Red Bay, AL

We rose at 6 this morning, needed to be in bay 32 by 7 am. The bay number was wrong. Needed to be in bay 42 for welding. Had to wait for the RV in the bay to be finished. 8am the RV is in and being welded. The welding is completed by 9. Glenn returned the RV to the campsite. 9:30 the call comes in to be in bay 32 and have the window replaced. The window is in and cleaned up by 10 am. Now have to wait for the windshield shop to check-replace the windshield chaulk.
Sylvia, June, Paul, and Glenn had lunch in Belmont, MS.
Till later!

No comments: